Lake Havasu U.S.D. – New Bus Barn & Maintenance Facility

About This Project

2015 | k-12 | 10,605 sq ft | $939,134

The district found they needed to move their existing bus fleet to the existing administrative office campus and create a new bus barn and maintenance facility for their crew. This new 10,605 S.F. metal building includes 2 bus repair bays, an exterior wash bay, interior steel storage mezzanine, drivers lounge & training center, 2 offices, work stations and associated restrooms. The site presented some challenges with a large retaining wall at the rear of the building. Working alongside the contractor, we were able to design a drainage solution to eliminate costly underground retention by use of stepped retaining walls and sloped concrete to redirect water coming from the hill behind away from the building.

Year

2015

Category
Education, K-12
Sq ft
10605
Cost
$939134