New Facilities for Navopache Electric Cooperative Phase 1

About This Project

2010 | municipal | 16,392 sq ft vehicle building | 17,027 sq ft warehouse | $8,000,000

 

A New 17,027  S.F. warehouse building consisting of offices, meter shop, break room, restrooms, warehouse storage mezzanines and loading dock. A new 16,392  S.F. vehicle building consisting of offices, restrooms, break room, transformer shop, service bays, and storage mezzanine. Pre-Engineered metal building with masonry walls, landscaping, and site work.

 

The first building is a vehicle maintenance facility, repair shop for electronics and communications, crew room, and transformer shop. It includes offices, conference rooms, break room, locker facilities, warehouse yard space, and features a solar hot water system and geothermal AC system. The second building is a meter shop and warehouse and includes offices, storage space, a meter testing and prep area, and features a solar hot water system. The overall project also includes extensive site development, site drainage, and heavy vehicle parking.

Year

2010

Category
Municipal
Sq ft
16392 sq ft vehicle building, 17027 sq ft Warehouse
Cost
$8000000